Fabroyir, Faiz Adzkiya and Irsyad Martias, Ph.D (2026) Menanti Janji Pembangunan: Temporalitas Infrastruktur dan Dinamika Harapan Mayarakat Kampung Bayam Pasca Pembangunan Jakarta International Stadium. Sarjana thesis, Universitas Brawijaya.
Abstract
Penelitian ini mengkaji bagaimana dampak dari pembangunan Jakarta International Stadium (JIS) terhadap masyarakat Kampung Bayam di Jakarta Utara yang mengalami penggusuran dan relokasi dengan janji hunian pengganti Kampung Susun Bayam (KSB) yang hingga kini belum terealisasi. Pembangunan JIS yang diposisikan sebagai simbol kemajuan kota dan imajinasi masa depan Jakarta, tidak hanya mengubah lanskap fisik, tetapi juga membentuk pengalaman waktu masyarakat yang terdampak melalui penantian berkepanjangan, ketidakpastian, dan juga keberlanjutan hidup mereka. Dengan menggunakan pendekatan antropologi pembangunan serta kerangka teori temporalitas infrastruktur dan konsep harapan dan ketidakpastian, penelitian ini menganalisis bagaimana janji pembangunan bekerja sebagai horizon temporal yang terus tertunda. Penelitian ini menggunakan metode etnografi melalui observasi partisipasi, wawancara mendalam, studi literatur serta pelacakan arsip dan dokumentasi, dengan berfokus pada masyarakat Kampung Bayam. Hasil penelitian menunjukkan bahwa pembangunan JIS menciptakan kondisi suspended present, di mana masyarakat hidup dalam masa kini yang tertahan akibat perubahan kebijakan dan negosiasi yang berlarut-larut, sementara stadion telah berdiri dan berfungsi sebagaimana mestinya. Meski berada dalam kondisi hidup yang serba terbatas di hunian sementara, masyarakat Kampung Bayam menunjukkan ketahanan melalui praktik pertanian urban, penguatan solidaritas komunitas, perjuangan kolektif, penekanan pada advokasi untuk menuntut hak mereka. Penelitian ini menegaskan bahwa pembangunan infrastruktur tidak dapat dipahami semata sebagai proyek teknis, melainkan sebagai proses sosial yang memproduksi harapan sekaligus ketidakpastian, serta membentuk cara masyarakat memaknai waktu, ruang, dan masa depan mereka di tengah janji pembangunan yang terus tertunda.
English Abstract
This study examines the impact of the construction of the Jakarta International Stadium (JIS) on the community of Kampung Bayam in North Jakarta, who were evicted and relocated with the promise of replacement housing in Kampung Susun Bayam (KSB), which has yet to be realized. The construction of JIS, positioned as a symbol of the city's progress and Jakarta's future vision, has not only changed the physical landscape but also shaped the temporal experience of the affected community through prolonged waiting, uncertainty, and the continuity of their lives. Using a developmental anthropology approach and a theoretical framework of infrastructure temporality and the concepts of hope and uncertainty, this study analyzes how development promises function as a continuously delayed temporal horizon. The study employs ethnographic methods through participant observation, in-depth interviews, literature review, and archival and documentary tracking, focusing on the Kampung Bayam community. The results show that the JIS development creates a suspended present, where the community lives in a stalled present due to policy changes and protracted negotiations, while the stadium has been built and is functioning as intended. Despite living in limited conditions in temporary housing, the Kampung Bayam community shows resilience through urban farming practices, strengthening community solidarity, collective struggle, and emphasizing advocacy to demand their rights. This research confirms that infrastructure development cannot be understood solely as a technical project, but rather as a social process that produces both hope and uncertainty, and shapes the way communities interpret their time, space, and future amid the promise of development that continues to be delayed.
| Item Type: | Thesis (Sarjana) |
|---|---|
| Identification Number: | 052612 |
| Subjects: | 300 Social sciences > 301 Sociology and anthropology |
| Divisions: | Fakultas Ilmu Budaya > Antropologi Budaya |
| Depositing User: | Annisti Nurul F |
| Date Deposited: | 06 Aug 2026 08:59 |
| Last Modified: | 06 Aug 2026 08:59 |
| URI: | http://repository.ub.ac.id/id/eprint/259552 |
|
Text (DALAM MASA EMBARGO)
Faiz Adzkiya Fabroyir.pdf Restricted to Registered users only Download (6MB) |
Actions (login required)
![]() |
View Item |
