Analisis Beban Kerja dan Kapasitas Produksi Divisi Finishing dengan Metode Work Sampling (Studi Kasus: Perusahaan Manufaktur Produksi Sparepart)

Rif`ah, Zein Aribatur and Wisnu Wijayanto Putro, ST., M.Eng (2023) Analisis Beban Kerja dan Kapasitas Produksi Divisi Finishing dengan Metode Work Sampling (Studi Kasus: Perusahaan Manufaktur Produksi Sparepart). Sarjana thesis, Universitas Brawijaya.

Abstract

Divisi finishing merupakan salah satu bagian dari departemen produksi pada perusahaan manufaktur produksi sparepart yang memiliki peran penting dalam proses penghalusan sparepart agar menghasilkan sparepart yang mengkilap. Proses finishing sparepart dikerjakan oleh lima operator. Berdasarkan data hasil pengamatan pendahuluan hasil pre-work sampling, diketahui bahwa tingkat produktivitas operator dibawah 85%, dimana nilai tersebut cukup rendah dan terdapat perbedaan yang signifikan antara ketetapan waktu produksi dan realita waktu produksi. Selain itu, terdapat indikasi timbulnya beban kerja yang diakibatkan oleh kelelahan yang dirasakan oleh operator divisi finishing. Penelitian ini dilakukan dengan metode work sampling untuk mengetahui kapasitas produksi dengan menghitung waktu baku dan workload analysis untuk mengetahui besar beban kerja yang dialami operator. Penelitian diawali dengan melakukan pengamatan aktivitas produktif dan non produktif, melakukan uji kecukupan dan keseragaman data, melakukan perhitungan performance rating dan allowance dari setiap operator, dan dilanjutkan dengan perhitungan waktu baku dari setiap produk sparepart yang dikerjakan oleh setiap operator. Setelah dilakukan perhitungan waktu baku, kemudian dilakukan perhitungan beban kerja dari setiap operator. Berdasarkan perhitungan work sampling, diperoleh hasil waktu baku produk yang dapat dijadikan sebagai acuan dalam melakukan proses finishing. Produk part Plate Mounting memperoleh waktu baku 2,69. Produk part Heat Sink memperoleh waktu baku 0,99 menit. Produk part Kubota memperoleh waktu baku 1,20 menit. Produk part Holder memperoleh waktu baku 0,18 menit. Produk part Cover memperoleh waktu baku 0,96 menit. Produk part Handle Seat A memperoleh waktu baku 0,62 menit. Produk part Handle Seat B memperoleh waktu baku 2,36 menit. Produk part Nozzle memperoleh waktu baku 0,55 menit. Produk part Adapter memperoleh waktu baku 1,88 menit. Produk part Cup Lower memperoleh waktu baku 1,44 menit. Produk part Bracket A memperoleh waktu baku 0,30 menit. Produk terakhir yaitu part Bracket C memperoleh waktu baku 3,96 menit. Berdasarkan perhitungan workload analysis, diperoleh nilai beban kerja sebelum dilakukan peningkatan kapasitas produksi pada rentang 83% - 88%. Perhitungan beban kerja setelah dilakukan peningkatan kapasitas produksi memperoleh nilai pada rentang 99% - 107%. Untuk menyesuaikan kapasitas produksi dengan nilai beban kerja, maka rekomendasi perbaikan yang diberikan yaitu pembuatan rencana pengerjaan produk sparepart menggunakan nilai kapasitas produksi final yang menunjukkan bahwa terdapat peningkatan terhadap kapasitas produksi dan nilai beban kerja di bawah 100%, dan diharapkan dapat dijadikan sebagai acuan dalam melakukan proses finishing.

English Abstract

The finishing division is a part of the production department in a spare parts manufacturing company that has an important role in the process of refining spare parts to produce shiny spare parts. The process of finishing spare parts is done by five operators. Based on preliminary observation data from pre-work sampling results, it is known that the productivity level of operators is below 85%, which is quite low and there is a significant difference between the fixed production time and the reality of production time. In addition, there are indications of workload arising due to fatigue experienced by operators of the finishing division. This research was conducted using the work sampling method to determine production capacity by calculating the standard time and workload analysis to determine the amount of workload experienced by the operator. The research begins with observing productive and non-productive activities, testing data adequacy and uniformity, calculating performance ratings and allowances for each operator, and continuing with calculating the standard time for each spare part product worked by each operator. After calculating the standard time, then calculating the workload of each operator. Based on work sampling calculations, the product standard time results are obtained which can be used as a reference in carrying out the finishing process. Plate Mounting part products obtain a standard time of 2.69. The Heat Sink part product obtains a standard time of 0.99 minutes. Kubota part products get a standard time of 1.20 minutes. Part Holder products obtain a standard time of 0.18 minutes. Part Cover products get a standard time of 0.96 minutes. The Handle Seat A part product obtains a standard time of 0.62 minutes. The Handle Seat B part product obtains a standard time of 2.36 minutes. The nozzle part product obtains a standard time of 0.55 minutes. Adapter part products obtain a standard time of 1.88 minutes. The Cup Lower part product obtains a standard time of 1.44 minutes. Bracket A part products obtain a standard time of 0.30 minutes. The last product, namely the Bracket C part, obtained a standard time of 3.96 minutes. Based on workload analysis calculations, the value of workload before increasing production capacity is obtained in the range of 83% - 88%. Calculation of workload after increasing production capacity obtains values in the range of 99% - 107%. To adjust production capacity to the workload value, recommendations for improvement are given, namely making a plan for working on spare parts products using the final production capacity value which indicates that there is an increase in production capacity and the workload value is below 100%, and is expected to be used as a reference in carrying out the finishing process.

Item Type: Thesis (Sarjana)
Identification Number: 0523070356
Uncontrolled Keywords: Produktivitas, Work Sampling, Waktu Baku, Workload Analysis
Subjects: 600 Technology (Applied sciences) > 670 Manufacturing
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Endang Susworini
Date Deposited: 10 Oct 2023 06:24
Last Modified: 10 Oct 2023 06:24
URI: http://repository.ub.ac.id/id/eprint/203621
[thumbnail of DALAM MASA EMBARGO] Text (DALAM MASA EMBARGO)
ZEIN ARIBATUR RIF`AH.pdf
Restricted to Registered users only

Download (6MB)

Actions (login required)

View Item View Item