Wicaksono, Andrian (2015) Pemilihan Supplier Baja H-Beam Dengan Integrasi Metode Analytical Hierarchy Process dan Technique For Order Preference By Similarity To Ideal Solution (Studi Kasus CV. Dharma Kencana). Sarjana thesis, Universitas Brawijaya.
Abstract
CV. Dharma Kencana adalah perusahaan yang bergerak dalam bidang jasa konstruksi mencakupi mechanical, konstruksi, civil, ducting, isolasi, dan tangki. Salah satu material yang digunakan dalam produksi adalah baja H-Beam dengan total permintaan sebanyak 84.600 kg pada tahun 2013. Dengan jumlah kebutuhan H-Beam tersebut, maka CV. Dharma Kencana memiliki 3 supplier yaitu supplier PT. A, supplier PT. B, supplier PT. C. Dalam pemenuhan material bahan baku baja H-Beam yang dilakukan oleh 3 supplier sering terjadi keterlambatan dalam pengiriman dan kesalahan spesifikasi material. Sehingga dapat mengakibatkan kerugian keuangan dan keterlambatan dalam penyusunan timeline proyek. Adanya kerugian tersebut maka perlu dilakukan pengukuran terhadap supplier untuk mengetahui kinerja supplier sehingga bisa dilakukan pemilihan supplier yang sesuai dengan kebutuhan dari CV. Dharma Kencana. Pemilihan supplier dapat dicapai dengan cara menentukan bobot kriteria dan subkriteria serta melakukan pengukuran kinerja berdasarkan bobot dari kriteria dan subkriteria tersebut. Penelitian ini bertujuan untuk mengetahui kriteria dan subkriteria pemilihan supplier yang sesuai dengan kebutuhan dari CV. Dharma Kencana, dan memberikan hasil pengambilan keputusan untuk pemilihan supplier terhadap CV. Dharma Kencana. Metode yang digunakan dalam penelitian ini adalah AHP dan TOPSIS. Fungsi dari metode AHP adalah untuk melakukan pembobotan terhadap kriteria dan subkriteria yang sesuai dengan kebutuhan CV. Dharma Kencana. Hasil dari pembobotan AHP menjadi data awal dalam melakukan pengukuran kinerja dengan menggunakan metode TOPSIS. Dari hasil metode TOPSIS adalah ranking pada supplier yang dapat digunakan dalam pengambilan keputusan terhadap supplier oleh CV. Dharma Kencana. Hasil dari penelitian ini menunjukkan ada 8 kriteria dan 17 subkriteria yang sesuai dengan kebutuhan CV. Dharma Kencana. Dengan menggunakan metode AHP dihasilkan bobot untuk kriteria dan subkriteria, bobot kriteria terbesar antara lain quality (27,8%) dan price (21,2%). Untuk hasil dari metode TOPSIS supplier PT. C ranking pertama dengan nilai separasi positif 0,0041 dan nilai separasi negatif 0,0076.
English Abstract
CV. Dharma Kencana is a privately held construction company that specializes in the design and construction of mechanical, civil, ducting, isolation, and tanks. To provide construction service, it has to manage material especially H-Beam steel which took the larger amount. In 2013, it required 84.600 kgs of H-Beam steel. There are three suppliers to fulfill H-Beam steel requirement. The suppliers are PT. A, PT. B and PT. C. Fulfillment of the H-Beam steel by those suppliers is often delayed in shipment and mistaken in material specifications. It gives disadvantages to the company such as time losses and money losses for reordering raw material and delaying the project timeline arrangement. Therefore, it is necessary to measure suppliers’ performance so that the selected supplier will meet company’s qualification. Supplier selection can be done by determining the weights of criteria and sub-criteria and measuring performance based on the weights of the criteria and sub-criteria in accordance with CV. Dharma Kencana qualification. This study aims to determine the criteria of supplier selection in accordance with CV. Dharma Kencana qualification and provide the results of decision-making for supplier selection to the CV. Dharma Kencana. The methods used in this study are Analytical Hierarchy Process (AHP) and Technique For Order Preference By Similarity To The Ideal Solution (TOPSIS). AHP method is used to perform the weighting of the criteria and sub-criteria in accordance with CV. Dharma Kencana qualification. It is continued by using TOPSIS method to measure the suppliers’ performance. The result of TOPSIS method can be used in decisions-making on supplier selection by CV. Dharma Kencana. Research results showed there were 8 criteria and 17 sub-criteria which is suitable with CV. Dharma Kencana qualification. AHP result showed the weight of criteria and sub-criteria. Criteria with the bigger weight are quality (27.8%) and price (21.2%). TOPSIS method resulted the ranking of the suppliers. PT. C is in the first place with positive separation value 0,0041 and negative separation value 0,0076.
| Item Type: | Thesis (Sarjana) |
|---|---|
| Identification Number: | SKR/FT/2015/77/051500749 |
| Subjects: | 600 Technology (Applied sciences) > 670 Manufacturing |
| Divisions: | Fakultas Teknik > Teknik Industri |
| Depositing User: | Budi Wahyono Wahyono |
| Date Deposited: | 05 Feb 2015 10:05 |
| Last Modified: | 21 Oct 2021 06:19 |
| URI: | http://repository.ub.ac.id/id/eprint/143921 |
Preview |
Text
COVER.pdf Download (1MB) | Preview |
Preview |
Text
LEMBAR_PERSETUJUAN.pdf Download (1MB) | Preview |
Preview |
Text
RINGKASAN.pdf Download (1MB) | Preview |
Preview |
Text
AHP_dan_TOPSIS_BAB_4,5.pdf Download (2MB) | Preview |
Preview |
Text
AHP_dan_TOPSIS_BAB_1,2,3.pdf Download (2MB) | Preview |
Preview |
Text
LEMBAR_PENGESAHAN.pdf Download (1MB) | Preview |
Preview |
Text
AHP_dan_TOPSIS_DAFTAR_PUSTAKA.pdf Download (1MB) | Preview |
Actions (login required)
![]() |
View Item |