Perencanaan Persediaan Material Berdasarkan Integrasi Distribution Requirement Planning dan Material Requirement Planning Pada PT PLN

Aritantia, Yuanita (2018) Perencanaan Persediaan Material Berdasarkan Integrasi Distribution Requirement Planning dan Material Requirement Planning Pada PT PLN. Sarjana thesis, Universitas Brawijaya.

Abstract

PT PLN adalah penyedia jasa listrik di Indonesia yang bertanggung jawab atas kebutuhan pelanggan tentang kelistrikan. PT PLN area Kediri merupakan salah satu perwakilan PT PLN yang bertanggung jawab atas kebutuhan material dari rayon Kediri Kota, Ngadiluwih, Grogol, Blitar, Tulungagung, Pare, Wingi, Campur Darat, Sutojayan, Srengat dan Ngunut. Produk yang diamati terbatas pada pasang baru satu phase. Masalah terjadi adalah kesenjangan antara permintaan produk pasang baru satu phase dan realisasi, kekurangan stok material, persediaan material tidak seimbang dan frekuensi distribusi material dari area ke rayon terlalu tinggi sehingga diperlukan perencanaan persediaan material berdasarkan integrasi Distribution Requirement Planning (DRP) dan Material Requirement Planning (MRP) agar pemasangan produk listrik satu phase dapat dilakukan dengan lancar. Pada penelitian ini dilakukan perhitungan peramalan permintaan dengan metode Moving Average, Weighted Moving Average, Exponential Smoothing, Exponential Smoothing with Seasonal, Winter Additive dan Winter Multiplicative. Metode peramalan yang menghasilkan nilai MSE terkecil menjadi metode terpilih yang digunakan sebagai dasar DRP. Langkah selanjutnya adalah pembuatan DRP sebagai dasar penjadwalan area mendistribusikan material ke rayon. Kemudian, integrasi DRP dan MRP dilakukan dengan menjumlahkan nilai planned shipment release dari seluruh DRP ditempatkan sebagai nilai gross requirement pada MRP. Setelah itu penentuan teknik lot sizing dilihat dari sifat data berdasarkan nilai koefisien variabilitas dan total biaya terkecil berdasarkan perhitungan MRP. Perhitungan MRP dengan teknik lot sizing usulan perbaikan menghasilkan ukuran lot dan waktu pemesanan yang optimal. Hasil penelitian menunjukkan DRP dapat digunakan sebagai dasar penentuan jadwal pendistribusian material dari area ke rayon. Hasil perhitungan MRP dengan teknik lot sizing menunjukkan Algoritma Wagner Whitin menghasilkan total biaya terkecil sehingga menjadi metode lot sizing untuk usulan perbaikan. Total biaya pengeluaran untuk seluruh material dengan menggunakan metode usulan perbaikan sebesar Rp 127.425.111, sedangkan total biaya pengeluaran untuk seluruh material pada kondisi existing perusahaan sebesar Rp 333.093.055. Total biaya pengeluaran untuk seluruh material yang dapat dihemat oleh perusahaan sebesar Rp 205.667.944 atau dalam persentase sebesar 61,75%.

English Abstract

PT PLN is a provider of electricity services in Indonesia which is a State Owned Enterprise (SOE) that is responsible for the needs of customers about electricity. PT PLN area Kediri is one of the representatives of PT PLN who is responsible for the material needs of Rayon Kediri Kota, Ngadiluwih, Grogol, Blitar, Tulungagung, Pare, Wingi, Campur Darat, Sutojayan, Srengat and Ngunut. The observed product is limited for the purpose of installing a new phase. The problem occurs is the gap between the demand for a new one-phase installation product and the realization, the lack of material stock, unbalanced material inventory and the frequency of material distribution from area to rayon is too high so material inventory planning is required based on the integration of the Distribution Requirement Planning (DRP) and the Material Requirement Planning MRP) so that the installation of one phase electrical product can be done smoothly. In this study, the calculation of demand forecasting with Moving Average Method, Weighted Moving Average, Exponential Smoothing, Exponential Smoothing with Seasonal, Winter Additive and Winter Multiplicative. The forecasting method that generates the smallest MSE value becomes the chosen method used as the basis of DRP. The next step is making the DRP as the base of the scheduling area distributing the material to rayon. Then, the integration of DRP and MRP is done by summing the planned shipment release value of all DRPs placed as gross requirement values on MRP. After that the determination of lot sizing technique seen from the data type based on the value of coefficient of variability and the total smallest cost based on the calculation of MRP. Calculation of MRP by lot sizing technique of proposed improvement result in lot size and optimal ordering time. The results show that DRP can be used as the basis for determining the schedule of distribution of materials from area to rayon. The result of MRP calculation by lot sizing technique shows Wagner Whitin algorithm yields the smallest total cost so that it becomes lot sizing method for improvement proposal. Total cost for all materials using the proposed method of repair of Rp 127.425.111, while the total cost for all materials in the existing state of the company amounted to Rp 333.093.055. Total cost of expenses for all materials that can be saved by the company amounted to Rp 205.667.944 or in percentage of 61,75%.

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2018/66/051800790
Uncontrolled Keywords: Algoritma Wagner Whitin, Distribution Requirement Planning, Lot Sizing, Material Requirement Planning, Peramalan, Perencanaan Persediaan
Subjects: 600 Technology (Applied sciences) > 658 General management > 658.7 Management of materials
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Budi Wahyono Wahyono
Date Deposited: 28 Mar 2018 02:31
Last Modified: 18 Oct 2021 02:57
URI: http://repository.ub.ac.id/id/eprint/9040
[thumbnail of YUANITA.pdf]
Preview
Text
YUANITA.pdf - Published Version

Download (4MB) | Preview

Actions (login required)

View Item View Item