Studi Alternatif Analisis Sambungan Balok-Kolom dengan Sistem Pracetak pada Gedung Volendam Holland Park Condotel Kota Batu

Wanda, Mahardhika Nurislam (2017) Studi Alternatif Analisis Sambungan Balok-Kolom dengan Sistem Pracetak pada Gedung Volendam Holland Park Condotel Kota Batu. Sarjana thesis, Universitas Brawijaya.

Abstract

Sebagai kota wisata, Kota Batu dituntut dengan maraknya pembangunan Condotel di dekat tempat-tempat wisata. Akan tetapi dengan banyaknya gedung – gedung yang dibangun membuat lahan yang tersedia semakin lama semakin sempit. Oleh karena itu, Kota Batu mulai membangun gedung–gedung bertingkat untuk mengatasi kekurangan lahan yang semakin sempit. Pembangunan gedung bertingkat saat ini sebagian besar masih tetap menggunakan metode beton bertulang konvensional dengan menggunakan bekisting yang dicor di tempat yang akan menelan biaya lebih mahal karena membutuhkan banyak sekali bekisting serta akan m emakan waktu yang lebih lama. Akan tetapi sekarang ada terobosan baru untuk mengurangi penggunaan bekisting yang banyak dan mengurasi lamanya durasi pengerjaan, yaitu dengan menggunakan metode pracetak yang dibuat di pabrik atau di lokasi proyek kemudian dirakit. Konsep pembangunan mengacu ke dalam SNI 03- 1726-2012 tentang tata cara perencanaan ketahanan gempa untuk struktur bangunan gedung dan non gedung serta SNI 03-2847-2002 tentang tata cara perhitungan struktur beton sehingga acuan kedua peraturan tersebut akan didapatkan struktur yang tahan gempa, efektif, dan efisien. Dalam studi ini merupakan analisis Gedung Volendam Holland Park Condotel Kota Batu dengan zona gempa 4 yang di rencanakan kembali dengan menggunakan metode pracetak. Dari hasil studi didapatkan bahwa dimensi balok sebelum cor penuh berdimensi 35 cm x 40 cm, sedangkan balok setelah cor penuh berdimensi 35 cm x 60 cm dengan tulangan lentur digunakan 6-D13 dan tulangan geser ∅ 8 harus memenuhi syarat aman terhadap kapasitas momen yang ada. Sedangkan untuk struktur kolom lantai 1 hingga lantai 4 berukuran 50cm x 80 cm dengan menggunakan tulangan lentur D19 dan tulangan geser ∅ 8 harus bisa menahan berat beban yang ada diatasnya.

English Abstract

As a tourism city, Batu City charged with rampant development Condotel near tourist attractions. But with the large number of buildings built to make land available is getting increasingly narrow. Therefore, the city began to build Stonebuildings land shortage to cope with an increasingly narrow. Terraced building currently still largely keep using conventional methods of reinforced concrete using formwork are casted in place would cost more expensive because it requires an awful lot of formwork and will take a longer time. But now there is a new breakthrough for reducing the use of formwork and reduce the length of the duration of the work, i.e., by using prefabricated method are made at the factory or atthe location of the project is then assembled. The concept of development refers toin the SNI 03-1726-2012 about the planning of earthquake resistance for building structures and building as well as a non SNI 03-2847-2002 about the procedures for calculation of concrete structures so that the second reference of the regulation will be earthquake resistant structures has been obtained, effective, and efficient. In this study is the analysis of the building of Volendam Holland Park Condotel Batu City with earthquake zone 4 on the plan back by using prefabricated method. From the results of the study are obtained that the dimensions of the beam before the cast was full of prolific 35 cm x 40 cm, while the beam after the cast is full of prolific 35 cm x 60 cm with elastic reinforcement used 6-D13 and shear reinforcement 8 bores must have to qualify it is safe against the capacity of the existing moment. As for the structure of the column of the 1st floor to the 4th floor measuring 50 cm x 80 cm with D19 bending reinforcement using reinforcement and shear 8 bores must should could withstand the weight of the load that is there on it.

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2017/535/051706228
Uncontrolled Keywords: pracetak, cor penuh, beban gempa, Volendam
Subjects: 600 Technology (Applied sciences) > 624 Civil engineering > 624.1 Structural engineering and underground construction > 624.18 Materials > 624.183 Masonry, cermic, allied materials > 624.183 4 Concrete > 624.183 41 Reinforced concrete (Ferroconcrete) > 624.183 414 Precast concrete
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Budi Wahyono Wahyono
Date Deposited: 08 Sep 2017 06:52
Last Modified: 13 Oct 2020 03:11
URI: http://repository.ub.ac.id/id/eprint/2269
[thumbnail of MAHARDHIKA NURISLAM WANDA.pdf]
Preview
Text
MAHARDHIKA NURISLAM WANDA.pdf

Download (6MB) | Preview

Actions (login required)

View Item View Item