Upaya Reduksi BOD, COD, dan TSS, serta Netralisasi pH Limbah Cair Batik dengan IPAL Biofilter Anaerob dan Aerob (Studi Kasus Industri Batik X di Kota Cilegon)

Dyahkirana Dzakiyah, Kartika and Dr. Ir. Alexander Tunggul Sutan Haji, MT and Putri Setiani, ST. MES. Ph.D (2023) Upaya Reduksi BOD, COD, dan TSS, serta Netralisasi pH Limbah Cair Batik dengan IPAL Biofilter Anaerob dan Aerob (Studi Kasus Industri Batik X di Kota Cilegon). Sarjana thesis, Universitas Brawijaya.

Abstract

Industri batik memberikan dampak ekonomi yang positif melalui penyerapan tenaga kerja, pemasukan devisa, dan pajak yang besar. Namun, industri ini juga menghadapi masalah pencemaran lingkungan akibat limbah yang dihasilkan, terutama pada industri batik tradisional. Industri batik X di Kota Cilegon, yang berdiri sejak 2014, juga mengalami masalah serupa dengan pembuangan limbah cair yang tidak tertib dan belum memiliki instalasi pengolahan air limbah (IPAL). Persetujuan teknis (Pertek) yang tertuang pada Peraturan Menteri Lingkungan Hidup dan Kehutahanan Nomor 5 Tahun 2021 dan KBLI 13134, Industri Batik X sebagai industri batik tergolong berpotensi pencemaran air tinggi sehingga berkewajiban untuk melaksanakan Pertek yang mengacu Baku Mutu pada Peraturan Menteri Lingkungan Hidup dan Kehutahanan Nomor P16/2019. Berdasarkan temuan tersebut, penelitian ini bertujuan untuk merencanakan dan menganalisis alternatif IPAL bagi Industri Batik X di Kota Cilegon serta menyusun engineering design sebagai aspek teknis dan Bill of Quantity (BOQ) dan Rancangan Anggaran Belanja (RAB) sebagai aspek finansial. Metode yang digunakan dalam penelitian ini adalah metode deskriptif kuantitatif, sementara pengambilan sampel air limbah menggunakan metode grab sampling. Hasil uji laboratorium terhadap karakteristik air limbah batik sebagai berikut pH 8,73, BOD 715,4 mg/L, COD 3.769,4 mg/L, TSS 511,5 mg/L, logam krom (Cr) 0,07 mg/L, serta minyak dan lemak 6.409 mg/L. Perancangan ini menghasilkan volume dan waktu tinggal pada bak ekualisasi 0,32 m3 dan 6,4 jam, tangki netralisasi 0,044 m3 dan 0,083 jam, bak pengendap awal 0,11 m3 dan 2 jam, bak biofilter anaerob 0,4045 m3 dan 7,7 jam, bak biofilter aerob 0,42 m3 dan 7,96 jam, serta bak pengendap akhir 0,152 m3 dan 2 jam. Sementara total biaya pembangunan dan pengadan peralatan sebesar Rp 37.247.818.

English Abstract

The batik industry provides a positive economic impact through employment, foreign exchange earnings, and substantial taxes. However, the industry also faces the problem of environmental pollution due to the waste produced, especially in the traditional batik industry. Batik industry X in Cilegon City, which was established in 2014, also experiences similar problems with unruly liquid waste disposal and does not yet have a wastewater treatment plant (WWTP). Technical approval (Pertek) stipulated in the Minister of Environment and Forestry Regulation Number 5 of 2021 and KBLI 13134, Batik Industry X as a batik industry is classified as having high water pollution potential so that it is obliged to implement Pertek which refers to the Quality Standards in the Minister of Environment and Forestry Regulation Number P16/2019. Based on these findings, this study aims to plan and analyse alternative WWTP for Batik X Industry in Cilegon City and prepare engineering design as a technical aspect and Bill of Quantity (BOQ) and Draft Budget as a financial aspect. The method used in this research is quantitative descriptive method, while sampling wastewater using grab sampling method. The results of laboratory tests on the characteristics of batik wastewater are as follows pH 8.73, BOD 715.4 mg/L, COD 3,769.4 mg/L, TSS 511.5 mg/L, chrome metal (Cr) 0.07 mg/L, and oil and fat 6,409 mg/L. This design resulted in volume and residence time in the equalisation basin of 0.32 m3 and 6.4 hours, neutralisation tank of 0.044 m3 and 0.083 hours, initial settling basin of 0.11 m3 and 2 hours, anaerobic biofilter basin of 0.4045 m3 and 7.7 hours, aerobic biofilter basin of 0.42 m3 and 7.96 hours, and final settling basin of 0.152 m3 and 2 hours. Meanwhile, the total cost of construction and equipment acquisition is IDR 37,247,818.

Item Type: Thesis (Sarjana)
Identification Number: 052310
Uncontrolled Keywords: Engineering Desain, Industri batik, Instalasi Pengolahan Air Limbah (IPAL), RAB, Batik Industry, Draft Budget, Engineering Design, Wastewater Treatment Plant (WWTP)
Divisions: Fakultas Teknologi Pertanian > Teknologi Industri Pertanian
Depositing User: Annisti Nurul F
Date Deposited: 18 Jan 2024 00:59
Last Modified: 18 Jan 2024 00:59
URI: http://repository.ub.ac.id/id/eprint/211602
[thumbnail of DALAM MASA EMBARGO] Text (DALAM MASA EMBARGO)
Kartika Dyahkirana D.pdf
Restricted to Registered users only until 31 December 2025.

Download (3MB)

Actions (login required)

View Item View Item