Eza, Agriansyah and Ir. Eko Andi Suryo, ST., MT., Ph.D and Dr.Eng. Ir. Eva Arifi, ST, MT (2023) Analisis Value Engineering Pada Proyek Pembangunan Gedung Terpadu Fakultas Sains Dan Teknologi , Fakultas Adab Dan Humaniora, Perpustakaan, Dan Administrasi Akademik (Gedung Aefg). Magister thesis, Universitas Brawijaya.

Abstract

Value Engineering (VE) adalah analisis dengan menggunakan pendekatan nilai terhadap fungsi dan dari hal tersebut hasil analisis ini digunakan untuk mencari dan menganalisis berbagai alternatif yang menghasilkan efisiensi biaya dengan tidak mengganti nilai fungsi. Tujuan dari penelitian ini adalah menganalisis berapa persen penghematan biaya yang dihasilkan melalui proses value engineering dari alternatif material yang terpilih. Proyek pembangunan PEMBANGUNAN GEDUNG TERPADU FAKULTAS SAINS DAN TEKNOLOGI, FAKULTAS ADAB DAN HUMANIORA, PERPUSTAKAAN, DAN ADMINISTRASI AKADEMIK (GEDUNG AEFG) dipilih menjadi objek penelitian karena untuk developer atau pengembang dari gedung ini akan mencapai desain yang lebih efektif serta menghilangkan biaya tidak perlu (unnecessary cost) tetapi menjamin nilai uang yang lebih baik. Pemilihan pekerjaan struktur untuk dilakukan analisis VE adalah karena biaya konstruksi dari pekerjaan struktur memiliki biaya yang paling besar (39%) yaitu sebesar Rp. 71.659.316.132,55 berdasarkan analisis diagram pareto. Selanjutnya adalah analisis value engineering menggunakan 5 tahapan yaitu tahap informasi, tahap spekulasi, dan yang terakhir tahap penyajian. Bekesting yang cocok digunakan pada proyek pembangunan Gedung terbut adalah bekesting full sistem, karena penghemanatan yang didapat ketika menggunakan bekesting tersebut yang awalnya Rp. 37.847.367.859,00 menjadi Rp. 36.272.941.264,76 sehingga terjadi penghematan sebesar Rp 1.574.426.594,24 dan untuk waktu pelaksanaanya yang awalnya 331 hari untuk pemasangan bekesting konvensional menjadi 75 Hari jika menggunakan bekesting full sistem.

English Abstract

Value Engineering (VE) is an analysis using a value approach to functions, and the results of this analysis are used to find and analyze various alternatives that produce cost efficiency without changing the value of the function. The purpose of this study is to analyze what percentage of cost savings are generated through the value engineering process from the selected alternative materials. The project for the construction of an INTEGRATED BUILDING FACULTY OF SCIENCE AND TECHNOLOGY, FACULTY OF ADAB AND HUMANITY, LIBRARY, AND ACADEMIC ADMINISTRATION (AEFG BUILDING) was chosen as the object of research because the developer or developer of this building will achieve a more effective design and eliminate unnecessary costs (unnecessary cost). but guarantees better value for money. The choice of structural work to carry out VE analysis is because the construction cost of structural work has the highest cost (39%), namely Rp. 71,659,316,132.55 based on Pareto chart analysis. Next is the value engineering analysis using five stages: the information stage, the speculation stage, and finally the presentation stage. The formwork suitable for the building construction project is a full system formwork because the savings obtained when using the formwork are initially Rp. 37,847,367,859.00 to Rp. 36,272,941,264.76, resulting in a savings of Rp. 1,574,426,594.24, and for the initial implementation time of 331 days for conventional formwork installation to 75 days if using a full system formwork.

Item Type: Thesis (Magister)
Identification Number: 042307
Uncontrolled Keywords: Rekayasa Nilai, Setruktur, Bekesting - Value Engineering, Structure, Formwork
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Unnamed user with username pratiwi
Date Deposited: 11 Jan 2024 02:54
Last Modified: 11 Jan 2024 02:54
URI: http://repository.ub.ac.id/id/eprint/207950
[thumbnail of DALAM MASA EMBARGO] Text (DALAM MASA EMBARGO)
Eza Agriansyah.pdf
Restricted to Registered users only until 31 December 2025.

Download (2MB)

Actions (login required)

View Item View Item