Jais, Achmad and Ir. M. Taufik Hidayat,, MT. and Dr. Retno Anggraini,, ST., MT. (2022) Studi Alternatif Perencanaan Struktur Menggunakan Beton Pracetak (Precast) Dengan Sistem Sambungan Balok - Kolom Pada Gedung Sekolah Grand Pakuwon Surabay. Sarjana thesis, Universitas Brawijaya.
Abstract
Sekolah Grand Pakuwon Surabaya merupakan lembaga pendidikan formal yang diharapkan dapat memberikan pengetahuan serta ilmu baru yang bermutu tinggi. Dimana peningkatan mutu pendidikan merupakan hal penting yang harus dilaksanakan oleh pemerintah. Peningkatan mutu tersebut dapat tercapai dengan cara sarana prasarana yang berkualitas. Sarana prasarana yang berkualitas bukan hanya dilihat dari indahnya suatu gedung, namun juga harus dipertimbangkan di segi infrastrukur yang aman. Pada Gedung Sekolah Gloria Grand Pakuwon dibangun dengan menggunakan sturktur beton bertulang konvensional (cast in situ), dimana struktur beton bertulang tersebut memiliki kelemahan yaitu waktu pengerjaanya yang dibilang cukup lama dan membutuhkan tenaga kerja yang banyak sehingga berimplikasi keluarnya dana yang cukup besar. Adapun alternatif perencanaan lain dengan menggunakan metode beton pracetak ( precast ) dimana metode ini sangat cocok digunakan pada Gedung Sekolah Gloria Grand Pakuwon karena memiliki denah yang identik tiap lantai. Adapun keunggulan lain yaitu dari segi elemen bangunan yang digunakan dapat memiliki mutu yang seragam karena proses fabrikasi dilakukan di pabrik, Penghematan tenaga kerja, serta waktu pelaksanaan relatif lebih cepat daripada beton bertulang konvensional. Tujuan dari penelitian ini adalah untuk mengetahui cara merencanakan dimensi Balok Kolom dengan metode pracetak pada Gedung Sekolah Gloria Grand Pakuwon, Untuk mengetahui cara merencanakan dan menganalisis kekuatan sambungan Balok Kolom dengan metode pracetak pada Gedung Sekolah Gloria Grand Pakuwon, dan untuk mengetahui cara peletakkan elemen beton pracetak (precast) pada bangunan Gedung Gloria Grand Pakuwon. Berdasarkan hasil analisis perencanaan pada balok-kolom menggunakan sistem pracetak sebelum cor penuh dengan beban yang dipikul oleh balok tersebut merupakan beban sendiri dari balok. Saat pengangkatan balok menunjukkan bahwa jarak tumpuan saat pengangkatan sejauh 2,05 m dari tepi balok. balok induk pracetak yang berukuran 40/40 dengan tulangan lentur yang mengalami tarik yaitu 9-D19 dan tulangan yang mengalami tekan yaitu 5-D19 serta sengkang ø10- 150 menghasilkan momen tumpuan yang besarnya sama dengan momen lapangan sebesar 976,74 kgm. Serta analisis hubungan balok – kolom pracetak baik yang ditengah maupun di pinggir struktur yang dilakukan pada kondisi setelah cor penuh dengan beban yang dipikul merupakan beban mati (D), beban hidup (L) dan beban gempa menunjukkan hasil yang aman terhadap lentur dan geser. Hal ini dapat dibuktikan dengan hasil analisis kapasitas momen terbesar balok pada beam 344 dengan menunjukkan momen nominal sebesar 737,05 kNm dimana lebih besar dari momen ultimate yang terjadi yaitu sebesar 661 kNm dan kuat geser nominal sebesar 2514,04 kN dimana lebih besar dari gaya geser yang terjadi yaitu sebesar 1339,87 kN.
English Abstract
Grand Pakuwon Surabaya School is a formal educational institution that is expected to be able to provide high-quality new knowledge and knowledge. Where improving the quality of education is an important thing that must be implemented by the government. This quality improvement can be achieved by means of quality infrastructure. Quality infrastructure is not only seen from the beauty of a building, but also must be considered in terms of safe infrastructure. The Gloria Grand Pakuwon School Building was built using a conventional reinforced concrete structure (cast in situ), where the reinforced concrete structure has a weakness, namely the processing time is quite long and requires a lot of manpower which has implications for a large outlay of funds. The other planning alternative is using the precast concrete method where this method is very suitable for use in the Gloria Grand Pakuwon School Building because it has an identical floor plan for each floor. The other advantages are that in terms of the building elements used, they can have uniform quality because the fabrication process is carried out at the factory, saving labor, and relatively faster implementation time than conventional reinforced concrete. The purpose of this study was to find out how to plan the dimensions of column beams using the precast method at the Gloria Grand Pakuwon School Building, to find out how to plan and analyze the strength of column beam joints using the precast method at the Gloria Grand Pakuwon School Building, and to find out how to place precast concrete elements. (precast) in the Gloria Grand Pakuwon building. Based on the results of the planning analysis on the beams using a precast system before they are fully cast with the load carried by the beam being the beam's own load. When lifting the beam shows that the pedestal distance when lifting is 2.05 m from the edge of the beam. Precast main beams measuring 40/40 with flexural reinforcement in tension, namely 9-D19 and reinforcement in compression, namely 5-D19 and stirrups ø10-150 produce a pinion moment which is the same as the pitch moment of 976.74 kgm. As well as analysis of the relationship of precast beams - columns both in the middle and on the edge of the structure which is carried out in conditions after full casting with the dead loads (D), live loads (L) and earthquake loads showing safe results against bending and shear. This can be proven by the results of the analysis of the largest moment capacity of the beam on beam 344 which shows a nominal moment of 737.05 kNm which is greater than the ultimate moment that occurs which is 661 kNm and a nominal shear strength of 2514.04 kN which is greater than the shear force that occurs is equal to 1339.87 kN.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | 0522070418 |
Uncontrolled Keywords: | balok pracetak, struktur beton, perkuatan, sambungan .- precast beam, concrete structure, reinforcement, connection |
Subjects: | 600 Technology (Applied sciences) > 624 Civil engineering |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Endang Susworini |
Date Deposited: | 05 Jun 2023 03:50 |
Last Modified: | 05 Jun 2023 03:50 |
URI: | http://repository.ub.ac.id/id/eprint/200699 |
Text (DALAM MASA EMBARGO)
ACHMAD JAIS.pdf Restricted to Registered users only until 31 December 2025. Download (20MB) |
Actions (login required)
View Item |