Athallah, Muhamad Farhan and Ir. M. Hamzah Hasyim, ST ., MT ., M.Eng.Sc. and Ir. Kartika Puspa Negara, ST ., MT ., Ph.D and Ir. Eko Andi Suryo, ST ., MT ., Ph.D (2022) Analisa Program Keselamatan Dan KesehatanKerja (K3) Terhadap Kinerja Pekerja Proyek Pembangunan Konstruksi Pembuangan Akhir Limbah B3 Kabupaten Lamongan. Sarjana thesis, Universitas Brawijaya.
Abstract
Tingginya angka kecelakaan kerja pada proyek konstruksi mengakibatkan kerugian baik secara materiil maupun secara waktu bagi pihak penyedia jasa konstruksi. Namun tingginya angka kecelakaan kerja ini dapat diminimalisir dengan adanya manajemen risiko. Dengan tujuan penelitian ini adalah mengetahui tingkat penerapan K3 (Kesehatan, dan Keselamatan Kerja) Konstruksi terhadap kinerja pekerja proyek pembangunan konstruksi pembuangan akhir limbah B3 Kabupaten Lamongan, menggunakan metode Hazard Identification Risk Assassment and Risk Control. Pada penelitian ini dilakukannya proses survey dengan membagikan kuisioner berdasarkan pada Sistem Manajemen Keselamatan Kerja (SMKK) yang terdapat pada Permen PU No. 21 Tahun 2019. Hasil kuisioner dianalisa dengan menggunakan metode Hazard Identification Risk Assassment and Risk Control. Dari hasil tersebut akan dikaji tingkat risiko dan pengendalian risiko yang ada pada proyek. Selanjutnya yaitu mengelompokkan hasil dari tingkat penerapan K3 yang sudah dijalankan pada proyek. Hasil dari penelitian ini menunjukkan dari hasil pembahasan dan analisis kegiatan observasi dan penelitian pada proyek Pembangunan Kontruksi Pembuangan Akhir Limbah B3 ini dapat disimpulkan beberapa hal Pengendalian risiko yang diperlukan pada skala prioritas tinggi untuk mencegah bahaya K3ialah pemasangan fasilitas administrasi sebesar 32%, penggunaan APD lengkap sebesar 32%, mengikuti prosedur kerja sebesar 18%, pemasangan scafolding sebesar 18% maka dengan ini memenuhi persyaratan.
English Abstract
The high number of work accidents in construction projects results in material and time losses for construction service providers. However, the high number of work accidents can be minimized with risk management. The purpose of this study was to determine the level of implementation of Safety, Health and Environment (SHE) in Construction on the performance of construction project workers for the construction of B3 waste final disposal in Lamongan Regency, using the Hazard Identification Risk Assassment and Risk control methods. In this study, a survey process was carried out by distributing questionnaires based on the Occupational Safety Management System (SMKK) contained in the Minister of Public Works Regulation No. 21 of 2019. The results of the questionnaire were analyzed using the Hazard Identification Risk Assessment and Risk Control method. From these results, the level of risk and risk control in the project will be assessed. The next step is to group the results from the level of implementation that has been carried out on the project. The results of this study show that from the results of the discussion and analysis of observation and research activities on the B3 Final Disposal Construction project, it can be concluded several things. Risk control needed on a high priority scale to prevent hazards is the installation of administrative facilities by 32%, the use of complete PPE by 32%, following work procedures by 18%, installation of scaffolding by 18% so hereby fulfills the requirements.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | 0522070361 |
Uncontrolled Keywords: | Kesehatan dan Keselamatan Kerja (K3), metode Hazard Identification Risk Assassment Risk Control. .- Safety, Health, and Environment (SHE), Hazard Identification Risk Assassment and Risk Control. |
Subjects: | 600 Technology (Applied sciences) > 624 Civil engineering |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Endang Susworini |
Date Deposited: | 11 Apr 2023 02:05 |
Last Modified: | 11 Apr 2023 02:05 |
URI: | http://repository.ub.ac.id/id/eprint/198124 |
Text (DALAM MASA EMBARGO)
MUHAMAD FARHAN ATHALLAH.pdf Restricted to Registered users only until 31 December 2024. Download (5MB) |
Actions (login required)
View Item |