Perancangan Keseimbangan Lintasan Produksi Ammunition Box Menggunakan Pendekatan Metode Heuristik

Srijayasari, Hariti and Prof. Dr. Ir. Pratikto,, M.MT., and Dr. Femiana Gapsari,, S.T., M.T., (2018) Perancangan Keseimbangan Lintasan Produksi Ammunition Box Menggunakan Pendekatan Metode Heuristik. Magister thesis, Universitas Brawijaya.

Abstract

(Badan Usaha Milik Negara) yang bergerak dalam bidang produk militer, saat ini kegiatan proses produksi berlokasi di Kabupaten Bandung untuk divisi senjata dan Turen Kabupaten Malang untuk divisi munisi. Dengan objek yang diteliti adalah proses produksi ammunition box yang dibagi menjadi tiga bagian yaitu tutup, badan dan perakitan akhir ammunition box. Jumlah permintaan yang meningkat tiap tahun membuat subdep produk pendukung ammunition box mengajukan jam lembur dan total waktu siklus pada bagian tutup ammunition box lebih besar dari badan ammunition box. Hal tersebut dapat mempengaruhi keseimbangan lini produksi karena menyebabkan bottleneck pada bagian perakitan akhir ammunition box yang dapat mempengaruhi efisiensi lini produksi. Pada penelitian ini metode yang digunakan adalah metode heuristik. Yaitu Helgeson Birnie (RPW) dan Moodie Young. Yang pertama adalah pengukuran waktu baku tiap elemen kerja. Kemudian waktu baku diolah untuk mengetahui kondisi awal stasiun kerja. Selanjutnya menghitung takt time untuk batasan tiap stasiun kerja. Hasil waktu baku yang diperoleh juga digunakan untuk metode Helgeson Birnie (RPW) dan Moodie Young pada pembebanan elemen kerja tiap stasiun kerja. Hasil pembebanan tiap elemen kerja tiap stasiun di tampilkan dengan gang process chart. Kemudian menghitung kriteria hasil performansi setiap bagian tutup dan badan ammunition box untuk pilih rancangan metode terbaik. Yang terakhir, rancangan metode terpilih dibandingkan dengan kondisi stasiun kerja awal dan dihitung biaya tenaga kerja. Metode heuristik terpilih adalah metode Moodie Young. Dibandingkan dengan kondisi awal, line efficiency mengalami peningkatan pada bagian tutup ammunition box sebesar 7,98% dan pada bagian badan ammunition box sebesar 21,77%. Lalu nilai balance delay mengalami penurunan dengan besar yang sama dengan peningkatan nilai line efficiency. Nilai smoothness index mengalami penurunan pada bagian tutup ammunition box sebesar 9,09 dan pada bagian badan ammunition box sebesar 152,87. Perhitungan total biaya tenaga kerja metode Moodie Young memberikan penghematan biaya sebesar 9.597.170 rupiah.

English Abstract

PT XYZ is a manufacturing company in Indonesia in the sphere of SOES (State Owned Enterprises) which is making military products. The activities of production is located in Bandung for armory division and Turen (Malang) for ammunition division. The examined object was the production process of ammunition box which is divided into three parts: cover, body and final assembly of the ammunition box. Increasing number of requests each year makes the company applies overtime hours and the total cycle time on the cover parts is larger than the body parts of the ammunition box. It can affect the balance in production line by causing a bottleneck at the final assembly of the ammunition box that could affect the efficiency of the production line. In this research, the methods used are methods of heuristics, which are Helgeson Birnie (RPW) and Moodie Young. The first step is to measure standart time in every element of work. Then, the standart time is processed to know the initial conditions of work stations. Next calculating takt time for the limitations of each work station. The result of standart times are also used for Helgeson Birnie (RPW) method and Moodie Young on the imposition of work elements in every work station. The results of each element impositions of each work station is showed with the gang process chart. Then, calculating the results of the performance criteria of cover and body parts of the ammunition box to select the best method of design. Lastly, the draft of the selected method is compared with the initial conditions of the work station and the calculated cost of labor. Selected heuristic method is a Moodie Young method. Compared to the initial conditions, the line's efficiency has increased 7.98% on the cover of ammunition box and 21,77% on the body of the ammunition box. The value of the balance delay has decreased with the same value of the increasing of line efficiency. The value of smoothness index has decreased 9,09 on the cover part of ammunition box and 152,87 on the body part of ammunition box. The total calculation of labor cost using Moodie Young method gives cost savings up to 9.597.170 rupiah.

Item Type: Thesis (Magister)
Identification Number: TES/621.8/SRI/p/2018/041900504
Uncontrolled Keywords: line balancing, heuristic method, Helgeson Birnie (RPW), Moodie Young dan biaya tenaga kerja,line balancing, heuristic method, Helgeson Birnie (RPW), Moodie Young and labor costs.
Subjects: 600 Technology (Applied sciences) > 621 Applied physics > 621.8 Machine engineering
Divisions: S2/S3 > Doktor Teknik Mesin, Fakultas Teknik
Depositing User: soegeng sugeng
Date Deposited: 07 Oct 2022 02:18
Last Modified: 07 Oct 2022 02:18
URI: http://repository.ub.ac.id/id/eprint/195408
[thumbnail of HARITI SRIJAYASARI.pdf] Text
HARITI SRIJAYASARI.pdf

Download (5MB)

Actions (login required)

View Item View Item