Analisis Implikasi Keterlambatan Pencairan Dana Talangan dalam Kemitraan Pabrik Gula dengan Petani Tebu (Studi Kasus Pada Pabrik Gula Kebon Agung).

Yustina, Reny and Prof.Gugus Irianto, SE.,MSA.,Ph.D.Ak. and Abdul Ghofar., M.Si.,M.Acc.,Ak.,DBA. (2018) Analisis Implikasi Keterlambatan Pencairan Dana Talangan dalam Kemitraan Pabrik Gula dengan Petani Tebu (Studi Kasus Pada Pabrik Gula Kebon Agung). Magister thesis, Universitas Brawijaya.

Abstract

Terjadinya penekanan harga gula kristal putih di tingkat lelang akibat merembesnya gula rafinasi dengan harga yang kompetitif berakibat harus dijalankannya mekanisme dana talangan, dimana peran distributor utama digantikan oleh investor. Dalam pelaksanaannya, investor kesulitan memasarkan gula hingga mengakibatkan terlambatnya pencairan dana talangan ke produsen gula. Produsen gula di Indonesia menjalankan operasional bisnisnya dengan menjalin kemitraan dengan petani Tebu Rakyat (TR). Atas kemitraan tersebut, masing-masing pihak memiliki peran dan tanggung jawab. Penelitian ini bertujuan untuk menganalisis implikasi atas keterlambatan pencairan dana talangan terhadap kemitraan dari sisi produsen gula, yakni PG Kebon Agung. Metode yang digunakan untuk menjawab pertanyaan penelitian adalah metode Studi Kasus. Hasil penelitian menunjukkan bahwa implikasi atas keterlambatan pencairan dana talangan terhadap PG Kebon Agung secara umum mengakibatkan terganggunya aliran dana. Akan tetapi, PG Kebon Agung mengambil kebijakan-kebijakan dengan pertimbangan utama keberlangsungan hidup petani. Kebijakan-kebijakan tersebut juga didukung oleh struktur tata kelola dalam kemitraan. Dilihat dengan bingkai Teori Biaya Transaksi, dengan mengunakan tiga aspek determinan untuk mengevaluasi struktur tata kelola perusahaan (spesifikasi aset, ketidakpastian dan frekuensi transaksi), penelitian juga menunjukkan bahwa PG Kebon Agung cenderung memiliki bentuk tata kelola integrasi vertikal penuh yang memberikan perusahaan kendali atas pasokan bahan baku dan saluran penjualan/distribusi

English Abstract

The occurrence of white crystal sugar price emphasis at the auction level due to the inclusion of refined sugar at competitive prices resulted in the implementation of a bailout mechanism, whereby the main distributor's role was replaced by investors. In its implementation, investors have difficulties in marketing the sugar, causing delay in disbursement of bailout funds to sugar producers. Sugar producers in Indonesia run their business operations by establishing partnerships with smallholder sugarcane farmers. On the partnership, each party has roles and responsibilities. This study aims to analyze the implications for the delay of disbursement of bailout funds to partnership from the sugar producers, namely PG Kebon Agung. Using Case Study method, the results show that the implications for the delay in disbursement of the bailout funds against PG Kebon Agung generally result in disruption of the flow of funds. However, PG Kebon Agung adopted policies with the primary consideration of farmers' survival. These policies are also supported by governance structures in partnerships. Viewed by the frame of Transaction Cost Theory, using three aspects of determinants to evaluate corporate governance structures (asset specifications, uncertainty and frequency of transactions), the study also shows that PG Kebon Agung tends to have a full vertical integration governance form that gives the company control over the supply of materials raw and sales/distribution channels.

Other obstract

-

Item Type: Thesis (Magister)
Identification Number: TES/338.73/YUS/a/2018/041807675
Uncontrolled Keywords: Kata kunci: kemitraan, dana talangan, teori biaya transaksi, studi kasus
Subjects: 300 Social sciences > 338 Production > 338.7 Business enterprises > 338.73 Partnerships
Divisions: S2/S3 > Magister Akuntansi, Fakultas Ekonomi dan Bisnis
Depositing User: yulia Chasanah
Date Deposited: 09 Sep 2022 03:19
Last Modified: 09 Sep 2022 03:21
URI: http://repository.ub.ac.id/id/eprint/194131
[thumbnail of reni yustina.pdf] Text
reni yustina.pdf
Restricted to Registered users only

Download (14MB)

Actions (login required)

View Item View Item