Pengurangan Risiko Bencana Letusan Gunung Bromo Berbasis Political Security di Kecamatan Sukapura, Kabupaten Probolinggo

Lesmana, Ratri Bayu and Dr. Eng. Turniningtyas Ayu Rachmawati, ST., MT. and Dr. Wara Indira Rukmi, ST., MT. (2021) Pengurangan Risiko Bencana Letusan Gunung Bromo Berbasis Political Security di Kecamatan Sukapura, Kabupaten Probolinggo. Sarjana thesis, Universitas Brawijaya.

Abstract

Gunung Bromo merupakan salah satu gunung api aktif di Pulau Jawa. Gunung Bromo memiliki siklus erupsi cukup singkat, antara 4 - 10 tahun. Erupsi terbesar terjadi pada tahun 2010 dan paling akhir terjadi pada tahun 2015. Kecamatan Sukapura merupakan kecamatan terdampak terparah akibat erupsi Gunung Bromo. Dampak erupsi mengakibatkan kerusakan pada bangunan, infrastruktur, dan lahan pertanian. Keberadaan Gunung Bromo berpotensi mengguncang stabilitas kehidupan bagi masyarakat yang tinggal di sekitarnya. Oleh sebab itu, penelitian ini bertujuan untuk melakukan upaya pengurangan risiko bencana Gunung Bromo di Kecamatan Sukapura. Pendekatan pengurangan risiko bencana pada penelitian ini menggunakan konsep human security pada aspek political security. Langkah awal pada penelitian adalah melakukan kajian tingkat risiko bencana. Langkah selanjutnya adalah melakukan penilaian prioritas alternatif pada aspek political security menggunakan metode Simple Additive Weighting (SAW) dengan pembobotan menggunakan metode Rank Order Centroid (ROC). Hasil penelitian menunjukkan tingkat risiko bencana Gunung Bromo di Kecamatan Sukapura yang tinggi berada di Desa Sariwani, Sapikerep, dan Ngadirejo. Prioritas alternatif pada aspek political security sebagai upaya pengurangan risiko bencana meliputi: 1. Ketersediaan bantuan pada masa rehabilitasi dan rekonstruksi; 2. Kecukupan bantuan pemerintah untuk kebutuhan sehari-hari pada masa rehabilitasi dan rekonstruksi; dan 3. Kemudahan dalam mengurus aset bergerak-tidak bergerak akibat erupsi Gunung Bromo.

English Abstract

Mount Bromo is one of the active volcanoes on Java Island. Mount Bromo has a fairly short eruption cycle, between 4 - 10 years. The largest eruption occurred in 2010 and the most recent occurred in 2015. Sukapura District is the worst affected district due to the eruption of Mount Bromo. The impact of the eruption caused damage to buildings, infrastructures, and agricultural lands. The existence of Mount Bromo has the potential to shake the stability of life for the people who live around it. Therefore, this study aims to make efforts to reduce the disaster risk of Mount Bromo in Sukapura District. Disaster risk reduction’s approach in this study uses the concept of human security in the political security aspect. The first step in this study asses of the disaster risk’s level. The next step asses of the alternative’s priority on the political security aspect using the Simple Additive Weighting (SAW) method with the weighting using the Rank Order Centroid (ROC) method. The results showed that the high level of disaster risk of Mount Bromo in Sukapura District was in Sariwani Village, Sapikerep Village, and Ngadirejo Village. The priority of alternatives in the political security aspect as an effort to reduce disaster risk include: 1. Availability of assistance during the rehabilitation and reconstruction period; 2. Sufficient government assistance for daily needs during the rehabilitation and reconstruction period; and 3. Ease of managing movable and immovable assets due to the eruption of Mount Bromo.

Other obstract

-

Item Type: Thesis (Sarjana)
Identification Number: 0521070331
Uncontrolled Keywords: Kata Kunci: Erupsi Gunung Bromo, Pengurangan Risiko Bencana, Political Security, SAW-ROC.
Subjects: 300 Social sciences > 307 Communities > 307.1 Planning and development > 307.121 6 City planning
Divisions: Fakultas Teknik > Teknik Perencanaa Wilayah dan Kota
Depositing User: yulia Chasanah
Date Deposited: 12 May 2022 06:59
Last Modified: 12 May 2022 07:00
URI: http://repository.ub.ac.id/id/eprint/190363
[thumbnail of DALAM MASA EMBARGO] Text (DALAM MASA EMBARGO)
BAYU LESMANA.pdf
Restricted to Registered users only until 31 December 2023.

Download (20MB)

Actions (login required)

View Item View Item