Analisis Perbandingan Pondasi Tiang Pancang dan Pondasi Tiang Bor Pada Proyek Pembangunan Gedung Laboratorium Vokasi dan Industri Kreatif Universitas Brawijaya Kampus Dieng.

Moudini, Laras Atikah (2020) Analisis Perbandingan Pondasi Tiang Pancang dan Pondasi Tiang Bor Pada Proyek Pembangunan Gedung Laboratorium Vokasi dan Industri Kreatif Universitas Brawijaya Kampus Dieng. Sarjana thesis, Universitas Brawijaya.

Abstract

Universitas Brawijaya melakukan pembangunan Gedung Laboratorium Vokasi dan Industri Kreatif Universitas Brawijaya Kampus Dieng Malang untuk menunjang kegiatan akademik mahasiswanya. Pada penelitian ini direncanakan ulang pondasi tiang pancang sebagai alternatif penggunaan pondasi tiang bor untuk menumpu gedung laboratorium tersebut. Adapun tujuan dari penelitian ini adalah untuk mengetahui perbandingan analisis perhitungan daya dukung, penurunan, serta biaya antara pondasi tiang pancang dan pondasi tiang bor. Dengan menggunakan metode analitis berdasarkan data N-SPT diperoleh dayadukung tiang pancang tunggal sebesar 1171,843 kN, dengan penggunaan tiang pancang direncanakan sebanyak 120 buah. Sedangkan tiang bor tunggal memiliki daya dukung sebesar 475,40 kN, dengan penggunaan tiang bor direncanakan sebanyak 196 buah. Dengan menggunakan metode analitis diperoleh penurunan tiang pancang tunggal sebesar 15,589 mm. Sedangkan penurunan tiang bor tunggal memiliki penurunan sebesar 39,327 mm. Validasi pondasi tiang pancang tunggal dan kelompok menggunakan program Plaxis 2D V20 memberikan hasil daya dukung maupun penurunan yang tidak berbeda jauh dari hasil dengan menggunakan metode analitis. Pekerjaan pondasi tiang pancang menghabiskan biaya sebesar Rp 7.373.694.512,78, sedangkan pekerjaan pondasi tiang bor mencapai Rp 8.463.126.337,15. Dari hasil perbandingan ini dapat diketahui bahwa pondasi tiang pancang mempunyai daya dukung yang lebih besar serta penurunan yang lebih kecil daripada pondasi tiang bor. Hal ini menunjukkan bahwa pondasi tiang pancang dapat lebih baik menumpu gedung tersebut. Dilihat dari aspek biaya pun penggunaan pondasi tiang pancang lebih ekonomis karena menghemat Rp 1.089.431.824,37, dengan penggunaan tiang yang lebih sedikit,daripada penggunaan pondasi tiang bor.

English Abstract

University of Brawijaya is building the Vocational and Creative Industry Laboratory Building University of Brawijaya Dieng Campus in Malang to support students’ academic activities. In this study, the driven pile foundation was re-planned as an alternative to the use of bored pile foundation to support the laboratory building. The purpose of this study is to determine the comparative analysis of the calculation of bearing capacity, settlement, and costs between driven pile foundation and bored pile foundation. By using analytical methods based on N-SPT data, the allowable bearing capacity of a single driven pile is 1171,843 kN, with 120 piles planned. While the single bored pile has an allowable bearing capacity of 475,40 kN, with 196 piles planned. By using analytical methods, a single driven pile settlement of 15,589 mm was obtained. Whereas the settlement of single bored pile is 39,327 mm. The validation of a single and group driven pile foundation using the Plaxis 2D V20 program gives bearing capacity and settlement results that are not much different from the analytical methods results. The driven pile foundation work costs Rp. 7.373.694.512,78, while the bored piled work costs Rp 8.463.126.337,15. From the results of this comparison, it can be seen that the driven pile foundation has greater bearing capacity and smaller settlement than the bored pile foundation’s settlement. This shows that the driven pile foundation can support the building sturdier. Even from the cost aspect, the use of driven pile foundations is more economical because it saves up to Rp 1.089.431.824,37, with the use of fewer piles, than using the bored pile foundations ones.

Other obstract

-

Item Type: Thesis (Sarjana)
Identification Number: 0520070013
Uncontrolled Keywords: Pondasi Tiang Pancang, Daya Dukung, Penurunan, Biaya, Driven Pile Foundation, Bearing Capacity, Settlement, Cost
Subjects: 700 The Arts > 720 Architecture > 720.4 Special topics of architecture
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Bambang Septiawan
Date Deposited: 28 Jan 2021 20:04
Last Modified: 10 Jan 2023 02:26
URI: http://repository.ub.ac.id/id/eprint/182113
[thumbnail of DALAM MASA EMBARGO] Text (DALAM MASA EMBARGO)
0520070013-Laras Atikah Moudini.pdf
Restricted to Registered users only until 31 December 2023.

Download (8MB)

Actions (login required)

View Item View Item