Perencanaan Sistem Distribusi Air Bersih Di Desa Argoyuwono Kecamatan Ampelgading Kabupaten Malang Dengan Bantuan Aplikasi Watercad V8.I

Wiguna, Adam (2019) Perencanaan Sistem Distribusi Air Bersih Di Desa Argoyuwono Kecamatan Ampelgading Kabupaten Malang Dengan Bantuan Aplikasi Watercad V8.I. Sarjana thesis, Universitas Brawijaya.

Abstract

Desa Argoyuwono Kecamatan Ampelgading Kabupaten Malang merupakan daerah pedesaan yang terletak di kaki Gunung Semeru. Namun, penduduk desa masih mengandalkan pengambilan air secara manual untuk pemenuhan kebutuhan air sehari hari mareka karena memang belum ada jaringan perpipaan yang memfasilitasi pendistribusian air bersih. Menyikapi hal tersebut dalam skripsi ini membahas tentang perencanaan sistem distribusi air bersih yang diharapkan dapat memfasilitasi dari pemenuhan kebutuhan air bersih bagi masyarakat Desa Argoyuwono, tanpa harus mengambil air secara manual. Rencana pendistribusian ini akan menggunakan sumber air yang terletak di daerah Kecamatan Pronojiwo Kabupaten Lumajang yang memiliki debit sebesar 6 liter/detik. Perencanaan jaringan air bersih dalam studi ini menggunakan aplikasi WaterCAD V8.i. Selain itu, dilakukan perhitungan Rencana Anggaran Biaya (RAB) yang akan dibutuhkan dalam pembangunan jaringan air bersih, meliputi pekerjaan pipa, pekerjaan pompa, dan pekerjaan tandon. Dari hasil perhitungan Rencana Anggaran Biaya (RAB), kemudian dilakukan analisa ekonomi menggunakan lima parameter, yaitu BCR (Benefit Cost Ratio), NPV (Net Present Value), IRR (Internal Rate Return), analisa pengembalian (payback period), dan analisa sensitivitas. Hasil pemodelan dan simulasi jaringan air bersih menggunakan aplikasi software WaterCAD V8.i menunjukan kondisi hidraulik sebagai berikut, kecepatan aliran dalam pipa berkisar 0,10 – 0,50 m/dt, kehilangan tinggi tekan dalam pipa berkisar 0,10 – 11,57 m/km, dan tekanan pada titik simpul berkisar 1,50 - 8,00 atm. Perhitungan Rencana Anggaran Biaya (RAB) yang akan dibutuhkan dalam pekerjaan pembangunan sistem jaringan distribusi air bersih adalah sebesar Rp 2.992.525.000,00 terbilang dua milyar sembilan ratus sembilan puluh dua juta lima ratus dua puluh lima ribu. Perhitungan analisa ekonomi dengan tingkat suku bunga 5,25% dan usia guna pembangunan 20 tahun menyatakan bahwa nilai BCR (Benefit Cost Ratio) sebesar 1,16617, nilai NPV (Net Present Value) sebesar Rp 52.204.374,37/tahun, nilai IRR (Internal Rate Return) sebesar 7,1%, analisa payback period adalah 10 tahun, dan harga jual airnya sebesar Rp 4.200,00.

English Abstract

Argoyuwono Village, Ampelgading District, Malang Regency is a rural area located at the base of Semeru Mountain. However, villagers still rely on manual water collects to meet their daily needs because there is no pipeline that facilitates the distribution of clean water. Based on that case, this thesis analyzes the planning of clean water distribution systems that are expected to facilitate the fulfillment of clean water needs for Argoyuwono Village Community without having to fetch water manually. This distribution plan will use a water source located in the Pronojiwo District of Lumajang Regency which has a discharge of 6 liter/second. Planning of clean water pipelines in this study will use WaterCAD V8.i software. Besides that, the calculation of the Budget Plan (RAB) to be needed in the construction of clean water networks, including pipeline works, pump work, and reservoir work. From the calculation of the Budget Plan (RAB), then an economic analysis is carried out using five parameters, namely BCR (Benefit Cost Ratio), NPV (Net Present Value), IRR (Internal Rate Return), payback period analysis, and sensitivity analysis. The results of the modeling and simulation of clean water networks using the WaterCAD V8.i software show the following hydraulic conditions, flow velocity in the pipe ranges from 0.10 to 0.50 m/s, head loss in the pipeline ranges from 0.099 to 11.566 m/km, and the pressure at the vertex is 1.50 - 8.00 atm. Calculation of the Budget Plan (RAB) to be needed in the work of building a clean water distribution network system is Rp 2,992,525,000.00, which is two billion nine hundred ninety-two million five hundred twenty-five thousand. The calculation of economic analysis with an interest rate of 5.25% and the useful life for 20 years states that the value of BCR (Benefit Cost Ratio) is 1.16617, the NPV (Net Present Value) value is Rp 52,204,374.37/year, the IRR (Internal Rate of Return) value is 7.1%, payback period analysis is 9.8 years, and the selling price of water of Rp 4,200.00

Other obstract

-

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2019/1052/052000745
Uncontrolled Keywords: WaterCAD, Rencana Anggaran Biaya, Analisa Ekonomi, WaterCAD, Calculation of The Cost Estimation, Economic Analysis
Subjects: 600 Technology (Applied sciences) > 627 Hydraulic engineering > 627.8 Dams and reservoirs > 627.81 Earthwork, planning, surveying
Divisions: Fakultas Teknik > Teknik Pengairan
Depositing User: Nur Cholis
Date Deposited: 10 Aug 2020 07:39
Last Modified: 25 Oct 2021 06:58
URI: http://repository.ub.ac.id/id/eprint/178872
[thumbnail of ADAM WIGUNA (2).pdf]
Preview
Text
ADAM WIGUNA (2).pdf

Download (11MB) | Preview

Actions (login required)

View Item View Item