Pengembangan Sistem Pengelolaan Lembar Kerja Anggaran Investasi pada Program Rencana Kerja Trafo Sisipan dan Jaringan Penunjang PLN Berbasis Web

Purwanti, Tri (2019) Pengembangan Sistem Pengelolaan Lembar Kerja Anggaran Investasi pada Program Rencana Kerja Trafo Sisipan dan Jaringan Penunjang PLN Berbasis Web. Sarjana thesis, Universitas Brawijaya.

Abstract

Lembar Kerja Anggaran Investasi (LKAI) Program Rencana Kerja (PRK) Trafo Sisipan dan Jaringan Penunjang merupakan usulan pekerjaan investasi untuk mengusulkan trafo sisipan dan jaringan penunjang pada PT PLN (Persero) UP3 Malang. PT PLN (Persero) UP3 Malang melakukan pengelolaan data usulan LKAI PRK Trafo Sisipan dan Jaringan penunjang secara manual menggunakan Microsoft Office Excel dengan data pendukung yang terpisah. Hal tersebut dapat membuat data usulan menumpuk setelah diperiksa kemudian direvisi, kesulitan dalam mengubah harga konstruksi yang mengalami perubahan yang tidak menentu. Selain itu, Unit Layanan Pelanggan (ULP) tidak bisa selalu mengetahui sampai dimana kemajuan usulan yang telah diajukan. Sistem pengelolaan LKAI pada PRK Trafo Sisipan dan Jaringan Penunjang dikembangkan sebagai solusi untuk mengatasi masalah yang telah dijelaskan. Sistem pengelolaan LKAI pada PRK Trafo Sisipan dan Jaringan Penunjang dikembangkan berbasis web dengan menggunakan model pengembangan perangkat lunak Waterfall. Sistem ini diharapkan dapat membantu PT PLN (Persero) UP3 Malang dalam pengelolaan data usulan LKAI PRK Trafo Sisipan dan Jaringan penunjang. Sistem ini telah diuji menggunakan teknik white-box testing pada pengujian unit dan pengujian integrasi dan teknik black-box testing pada pengujian validasi. Pengujian unit dan integrasi dilakukan pada 3 method sebagai sampel pengujian serta pengujian validasi dilakukan pada 54 kebutuhan fungsional yang memberikan hasil valid.

English Abstract

Work Plan Program of Inserted Transformer and Support Network in Investment Budget Worksheet is an investment job proposal to propose inserted transformer and support network at PT PLN (Persero) UP3 Malang. PT PLN (Persero) UP3 Malang has been managing the proposal data of such work plan program manually using Microsoft Office Excel with separated data support. It causes duplication on the proposal data after being checked and revised, difficulties to change the price of construction which has undergone uncertain revision. Further, the Customer Service Unit (ULP) doesn’t always know the progress of the submitted proposal. Investment Budget Worksheet Management system for Work Plan Program of Inserted Transformer and Support Network has been developed as a solution to solve such problems. The system was developed in a web-based platform and a waterfall development model. This system is expected to help PT PLN (Persero) UP3 Malang in managing the proposal data of Work Plan Program of Inserted Transformer and Support Network. This system has been tested using white-box testing technique for unit and integration testings, and black-box testing technique for validation testing. Unit and integration testings has been done on 3 samples method and passed validation testing on 54 functional requirements which give valid results.

Other obstract

-

Item Type: Thesis (Sarjana)
Identification Number: SKR/FILKOM/2019/641/051907812
Uncontrolled Keywords: lembar kerja anggaran investasi, model waterfall, trafo sisipan dan jaringan penunjang, investment budget worksheet management, waterfall model, inserted transformer and support network
Subjects: 000 Computer science, information and general works > 006 Special computer methods > 006.7 Multimedia systems > 006.707 2 Web sites--research
Divisions: Fakultas Ilmu Komputer > Teknik Informatika
Depositing User: Budi Wahyono Wahyono
Date Deposited: 24 Aug 2020 07:25
Last Modified: 21 Oct 2021 02:02
URI: http://repository.ub.ac.id/id/eprint/174070
[thumbnail of Tri Purwanti (2).pdf]
Preview
Text
Tri Purwanti (2).pdf

Download (4MB) | Preview

Actions (login required)

View Item View Item