Studi Perencanaan Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Laboratorium Agrotechnopark Cangar Universitas Brawijaya di Desa Sumber Brantas Kecamatan Bumiaji Kota Batu

Riduwan, Achmad (2019) Studi Perencanaan Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Laboratorium Agrotechnopark Cangar Universitas Brawijaya di Desa Sumber Brantas Kecamatan Bumiaji Kota Batu. Sarjana thesis, Universitas Brawijaya.

Abstract

Dalam studi ini, Laboratorium Agrotechnopark Cangar Universitas Brawijaya menjadi obyek yang dikaji. Lokasi studi perencanaan PLTMH terletak di sungai Cangar Desa Sumber Brantas Kecamatan Bumiaji Kota Batu Provinsi Jawa Timur dengan ketinggian 1400 s/d 1700 meter dari permukaan laut dan luas wilayahnya 541,1364 Ha. Pada tahun 2015 hampir setiap bulan mengalami musim hujan dengan rata-rata curah hujan 139,17 mm/bulan dan rata-rata hari hujan sebanyak 12 hari/bulan lokasi sungai dengan inflow yang cukup sehingga dalam operasinya PLTMH Cangar harus dilakukan analisa untuk memprediksi berapa daya yang dibangkitkan dan komponen komponen apa saja yang perlu dibangun untuk menunjang PLTMH Cangar. Studi ini akan mengkaji hasil tentang bangunan sipil dan hidromekanikal di Sungai Cangar dengan menggunakan beberapa metode. Parameter-parameter dari Sungai Cangar tahun akan digunakan untuk menghitung tinggi jatuh efektif, analisa debit banjir dan debit andalan dan daya yang dapat dibangkitkan pada PLTMH Cangar. Hasil perhitungan didapatkan kombinasi bangunan sipil, mekanikal dan elektrikal PLTMH Cangar. Dengan Q100th = 69,9468 m3/dtk direncanakan lebar bendung 6,3 meter dan tinggi bendung = 2 meter. Peredam energi menggunakan kolam olak USBR tipe III dengan froude pada ujung lereng bendung 3,012. Debit desain pada bangunan pengambilan = 0,11 m3/dtk dengan lebar intake 0,5 meter dan tinggi muka air = 3,160 meter. Saluran pembawa direncanakan memiliki kemiringan 0,1 %, lebar 0,5 meter dengan pasangan batu. Panjang dari bak penenang = 3,75 meter dan lebar = 1,5 meter dengan volume tampungan 3,67 m3. Pipa pesat pada PLTMH Cangar menggunakan pipa PVC dengan diameter 0,267 meter atau 11,023 inchi tetapi dikarenakan tidak ada ukuran pipa yang sama, maka mengikuti ukuran pipa pabrikasi = 10 inchi dengan panjang pipa 110,767 meter. Klasifikasi turbin berdasarkan tinggi jatuh, aliran dan kecepatan spesifik (NS), PLTMH Cangar menggunkan Turbin Propeler. Spesifikasi Teknis saluran Pembuang disarankan sama dengan saluran pembawa. Daya yang dihasilkan PLTMH Cangar dengan debit 0,11 m3/dtk dan tinggi jatuh efektif 9,28 meter adalah 6,89052 kW. Jika diperuntukan untuk pemukiman dengan asumsu kebutuhan tiap rumah =170 watt, maka daya yang dihasilkan dapat menghidupkan 40 rumah. Total biaya yang diperlukan untuk pembangunan PLTMH Cangar adalah Rp 1.776.000.000,- terbilang satu milyar tujuh ratus tujuh puluh enam juta rupiah.

English Abstract

In this study, the Brawijaya Agrotechnopark Cangar Laboratory is the object under study. The study location of the micro hydro power palnning is located on the Cangar river Sumber Brantas Village, Bumiaji District, Batu city, East Java Province with an altitude of 1400 to 1700 meters above sea level and an area of 541.1364 Ha. In 2015 almost every month experiences the rainy season with an average rainfall of 139,17 mm/month and the average rainy day of 12 days/month rover location with sufficient inflow so that in the operation the Cangar micro hydro power must be analyzed to predict how much power which is generated and what componenets need to be built to support the Cangar microhydro power. . This study will examine the results of civil and hydromechanical buildings on the Cangar River using several methods. The parameters of the year Cangar River will be used to calculate the effective fall height, flood discharge analysis and mainstay discharge and power that can be generated at the Cangar MHP. The calculation results obtained by a combination of civil, mechanical and electrical buildings of Cangar MHP. With Q100th = 69.9468 m3 / second planned width of the dam is 6.3 meters and weir height = 2 meters. Energy absorbers use the USBR type III pool with froude at the end of the dam slope 3,012. Design discharge at building is taken = 0.11 m3 / sec with intake width of 0.5 meters and water level = 3.160 meters. The carrier channel is planned to have a slope of 0.1%, width of 0.5 meters with a pair of stones. The length of the sedimentary tub = 3.75 meters and width = 1.5 meters with a storage volume of 3.67 m3. Fast pipes in the Cangar MHP use PVC pipes with a diameter of 0.267 meters or 11.023 inches but because there is no same pipe size, it follows the size of the manufacturing pipe = 10 inches with a pipe length of 110.767 meters. Classification of turbines based on fall height, flow and specific speed (NS), Cangar MHP uses Propeller Turbines. The recommended waster channel technical specifications are the same as the carrier channel. The power produced by the Cangar MHP with discharge of 0.11 m3 / sec and the effective fall height of 9.28 meters is 6.89052 kW. If it is intended for settlements with Asumsu needs of each house = 170 watts, then the power produced can turn 40 houses. The total cost needed for the construction of the Cangar MHP is Rp. 1,776,000,000 - which is one billion seven hundred seventy six million.

Other obstract

-

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2019/803/051907731
Uncontrolled Keywords: PLTMH Cangar, Agrotechnopark Universitas Brawijaya, Sungai Cangar, bendung, Cangar Micro Hydro Power, Agrotechnopark Brawijaya University, Cangar River, Weir
Subjects: 600 Technology (Applied sciences) > 621 Applied physics > 621.3 Electrical, magnetic, optical, communications, computer engineering; electronics, lighting > 621.31 Generations, modification, storage, transmission of electric power > 621.312 Generation, modification, storage > 621.312 1 Generation > 621.312 13 Specific kinds of mechanical generations > 621.312 134 Hydroelectric generation
Divisions: Fakultas Teknik > Teknik Pengairan
Depositing User: Budi Wahyono Wahyono
Date Deposited: 05 Oct 2020 02:56
Last Modified: 05 Oct 2020 02:56
URI: http://repository.ub.ac.id/id/eprint/173774
Full text not available from this repository.

Actions (login required)

View Item View Item