Pengendalian Persediaan Suku Cadang Mesin Rotor Spinning Menggunakan EOQ Probabilistik dengan Mempertimbangkan FSN-ABC-VED pada PT Indiratex Spindo

Sukma, Puspitasari Andra (2019) Pengendalian Persediaan Suku Cadang Mesin Rotor Spinning Menggunakan EOQ Probabilistik dengan Mempertimbangkan FSN-ABC-VED pada PT Indiratex Spindo. Sarjana thesis, Universitas Brawijaya.

Abstract

Perusahaan pemintalan benang, PT Indiratex Spindo yang memproduksi benang open end yang digunakan sebagai bahan baku tekstil. Produksi benang open end memiliki 4 proses, yaitu proses blowing, proses carding, proses drawing, dan proses open end. Keseluruhan mesin yang beroperasi, bekerja selama 24 jam sehingga mengharuskan perusahaan memperhatikan kondisi mesin. Keluhan yang sering muncul yang berhubungan dengan perawatan adalah ketidaktersediaannya suku cadang ketika dibutuhkan. Permasalahan yang terjadi adalah adanya overstock dan shortage suku cadang pada corrective maintenance yang dapat berdampak tidak tercapainya target produksi. Keadaan tersebut terjadi dikarenakan perusahaan belum memperhitungkan quantity dan reorder point. Di sisi lain, suku cadang harus terklasifikasi sesuai dengan tingkat prioritasnya. Hal tersebut menyebabkan kesalahan dalam melakukan pengendalian persediaan yang dapat berdampak pada total biaya persediaan. Suku cadang yang digunakan sebagai objek penelitian yaitu mesin rotor spinning dikarenakan memiliki demand yang tinggi dan dianggap mesin terpenting. Perbaikan kebijakan pengendalian pesediaan di PT Indiratex Spindo ini dilakukan untuk meminimasi total biaya persediaan. Penelitian ini diawali dengan mengklasifikasikan suku cadang mesin rotor spinning yang tingkat prioritasnya dianggap paling penting menggunakan matriks gabungan klasifikasi FSN-ABC-VED. Kemudian dilakukan pengendalian persediaan dengan metode EOQ Probabilistik: continuous review (s,S) dan periodic review (R,s,S). Metode ini dilakukan untuk mendapatkan parameter input berupa reorder point dan inventory maximum suku cadang di kelas FAE dan FBV. Pengendalian persediaan akan menghasilkan total biaya persediaan dari kedua metode tersebut, kemudian dibandingkan dengan kebijakan eksisting sehingga diperoleh metode terpilih. Parameter input dari metode terpilih akan digunakan pada rekomendasi penerapan pengendalian persediaan periode selanjutnya dengan menggunakan Simulasi Monte Carlo. Berdasarkan hasil klasifikasi pada kelas FAE dan FBV terdapat 3 suku cadang yaitu Transfer Tail Plate D54, Seal 9.3-4-.5 dan Washer D40 F.ROT.GEH. Hasil dari pengendalian persediaan didapatkan bahwa continuous review (s,S) menjadi metode terpilih untuk ketiga suku cadang tersebut. Metode continuous review (s,S) mampu menghasilkan total biaya persediaan lebih rendah dibandingkan metode periodic review (R,s,S) dan kebijakan eksisting. Penurunan total biaya persediaan untuk ketiga suku cadang Transfer Tail Plate D54, Seal 9.3-4-.5 dan Washer D40 F.ROT.GEH berturut-turut adalah Rp 3.379.283, Rp 32.005.460 dan Rp 96.789.85 dari kebijakan eksisting. Hasil penelitian ini didapatkan bahwa penerapan hasil perhitungan Continuous Review (s,S) dapat minimasi total biaya persediaan yang dikeluarkan perusahaan sehingga finansial perusahaan lebih baik.

English Abstract

PT Indiratex Spindo is thread-spinning company, produces open-end thread which is used as material for textile products. Open-end thread production consists of 4 processes, blowing process, carding process, drawing process, and open-end process. The machines operate for 24 hours a day and therefore it require the company to constantly monitor machineries conditions. Problems occurring due to maintenance isues are spare parts shortage and spare parts overstock on corrective maintenance activities that might impact production targets. This problem arise since the company has never considered quantity and reorder point for machine spare parts. On the other hand, spare parts has not been classify according to its priority. This causes error in inventory control of spare parts which then impacts the total inventory cost. The object of this research is the rotor spinning machine spare part inventory management since it has the highest demand and considered to be the most important machine in the process. Inventory policy improvement on PT Indiratex Spindo was done to minimize total inventory cost. This research was initialized by classifying rotor spinning machine spare parts based on its priority using the combination matrix of FSN-ABC-VED. After that, inventory control was done using Probabilistic EOQ method: Continuous Review (s,S) and Periodic Review (R,s,S). This method was done to gain input parameter reorder point and maximum inventory of class FAE and FBV spare parts. Inventory control would produce a total inventory cost from both method, which were then compared, resulting in the preferred method. Input parameter from chosen method would then be used to implement improved inventory control policy on the next period through the use of Monte Carlo Simulation. Based on the classification result on FAE and FBV class, there were 3 spare parts that needed attention which are Transfer Tail Plate D54, Seal 9.3-4-.5 and Washer D0 F.ROT.GEH. The result from continuous review (s,S) inventory control was chosen to be the preferred method for the three spare parts. The continuous review (s,S) method was able to result in a lower total inventory cost compared to the periodic review (R,s,S) method and existing method. The total inventory cost decrease on the three spare parts Transfer Tail Plate D54, Seal 9.3-4-.5 and Washer D0 F.ROT.GEH were Rp 3.379.283, Rp 32.005.460, and Rp 96.789.850. The result of this research was that implementation of continuous review (s,S) method policy were able to minimize total inventory cost of the company.

Other obstract

-

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2019/641/051905267
Uncontrolled Keywords: Klasifikasi FSN-ABC-VED, Continuous Review (s,S), Periodic Review (R,s,S), Total Biaya Persediaan. FSN-ABC-VED Classification, Continuous Review (s,S), Periodic Review (R,s,S), Total Inventory Cost.
Subjects: 600 Technology (Applied sciences) > 658 General management > 658.7 Management of materials
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Budi Wahyono Wahyono
Date Deposited: 12 Nov 2020 15:49
Last Modified: 12 Nov 2020 15:49
URI: http://repository.ub.ac.id/id/eprint/171469
Full text not available from this repository.

Actions (login required)

View Item View Item