Studi Perencanaan Bangunan Groundsill dan Revetment Sungai Pengaman Jembatan Bandung di Parit Raya, Kabupaten Tulungagung

Andriantari, Nur Fadhlillah (2019) Studi Perencanaan Bangunan Groundsill dan Revetment Sungai Pengaman Jembatan Bandung di Parit Raya, Kabupaten Tulungagung. Sarjana thesis, Universitas Brawijaya.

Abstract

Parit Raya merupakan salah satu sungai buatan yang terletak di Kabupaten Trenggalek dan Kabupaten Tulungagung, bagian hulunya terletak di Desa Bendorejo, Kecamatan Pogalan, Kabupaten Trenggalek, sedangkan hilirnya berada di Desa Besuki, Kecamatan Besuki, Kabupaten Tulungagung. Disebelah hulu Parit Raya menyatu dengan Kali Ngasinan. Disepanjang Parit Raya muncul permasalahan berupa banyaknya tanggul/tebing yang kritis, bangunan air yang hancur dan longsor yang dapat mengancam pemukiman warga serta banyak juga abutment dari jembatan yang mengalami degradasi akibat luapan Parit Raya pada daerah hulu, sehingga jembatan-jembatan tersebut tidak dapat difungsikan kembali. Dalam kajian ini, penempatan bangunan groundsill dan revetment terletak di river station P+79.38. Jarak bangunan groundsill ±10 m sebelah hilir jembatan Bandung dengan bentang sungai 55,580 m. Perencanaan groundsill dan revetment dilakukan untuk melindungi pangkal (abutment) jembatan dari penurunan setempat (local scouring). Langkah awal yang dilakukan dalam studi perencanaan bangunan groundsill dan revetment pada Jembatan Bandung adalah analisa hidrologi. Untuk perhitungan analisa debit banjir rancangan kala ulang 25 tahun menggunakan metode Hidrograf Satuan Sintetis Nakayasu. Dari hasil perhitungan didapatkan debit sebesar 569,762 m3/dt. Sedangkan untuk analisa profil aliran akan di running menggunakan aplikasi HEC-RAS 5.0.3. Dengan menggunakan aplikasi HEC-RAS 5.0.3 dengan kala ulang 25 tahun kondisi aliran pada Parit Raya terjadi peluapan pada beberapa patok tertentu. Untuk detail dimensi perencanaan bangunan groundsill yaitu tinggi main dam 1,5 m, lebar pelimpah 50 m, tebal mercu main dam 2 m, kedalaman pondasi 1,2 m, tinggi sub dam 0,80 m dan tebal mercu sub dam 2 m. Untuk perencanaan bangunan revetment dengan tinggi bangunan 6,5 m dan kedalaman pondasi 1 m. Dengan daya dukung izin tanah yang tidak memenuhi syarat maka dibantu dengan adanya tiang pancang dengan panjang 7,8 meter untuk groundsill dan 8 m untuk revetment.

English Abstract

Parit Raya is one of the artificial rivers located in Trenggalek Regency and Tulungagung Regency. The upstream is located in Bendorejo Village, Pogalan District, Trenggalek Regency, while the downstream is in Besuki Village, Besuki District, Tulungagung District.In the upstream, Parit Raya merges with Ngasinan River. Along Parit Raya appears some problems such as critical levee / cliffs, broken water buildings, dangerous landslides that can threaten residents settlements and degraded abutments from bridges due to the overflow of Parit Raya in the upstream area, so that the bridges cannot be used. In this study, the placement of groundsill and revetment is located in 79.38 station. The groundsill itself is located ± 10 m from the downstream of the Bandung bridge and 55,580 m width. Groundsill and revetment planning is conducted to protect the base ( an abutment ) the bridge of the local scouring. The first step taken in the groundsill building planning study and revetment at the Bandung bridge is hydrological analysis. For the calculation of designed flood discharge analysis of 25 return period uses the Nakayasu Synthetic Unit Hydrograph method. From the calculation, the discharge is 569,762 m3 / dt. While the flood analysis will be run by HEC-RAS 5.0.3 application. Using the HEC-RAS 5.0.3 application with a 25-year return period the flow conditions in Parit Raya were flooded in certain stakes.Moreover, the detailed dimensions of the groundsill are stated as follow: the height of the main dam is 1,5 m, the width of the main dam is 50 m, the thickness of the main dam is 2 m, the depth of the foundation is 1,2 m, the height of the sub dam is 0,80 m and the thickness of the sub dam is 2 m. For revetment, the height is 6,5 m, the depth of the foundation is 1 m With the land allowance carrying capatity that doesn’t meet the requirements, it is assisted by the presence of a 7,8 meter long pile for groundsill and 8 m for the revetment.

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2019/244/051904703
Uncontrolled Keywords: Groundsill, Revetment, Parit Raya, HEC-RAS-Groundsill, Revetment, Parit Raya, HEC-RAS
Subjects: 600 Technology (Applied sciences) > 628 Sanitary engineering > 628.1 Water supply > 628.11 Sources > 628.112 Lakes, rivers, springs
Divisions: Fakultas Teknik > Teknik Pengairan
Depositing User: soegeng sugeng
Date Deposited: 15 Sep 2020 06:12
Last Modified: 15 Sep 2020 06:12
URI: http://repository.ub.ac.id/id/eprint/171236
Full text not available from this repository.

Actions (login required)

View Item View Item