Analisis Sistem Interkoneksi Jaringan Listrik Kabel Bawah Laut Pulau Ambon, Haruku, Dan Saparua Di Propinsi Maluku

Tupalessy, Johanis (2015) Analisis Sistem Interkoneksi Jaringan Listrik Kabel Bawah Laut Pulau Ambon, Haruku, Dan Saparua Di Propinsi Maluku. Magister thesis, Universitas Brawijaya.

Abstract

Abstrak–-Analisis stabilitas sistem daya diperlukan untuk mengetahui unjuk kerja suatu sistem tenaga listrik. Dalam paper ini analisis dilakukan pada interkoneksi sistem Ambon, Haruku, dan Saparua. Analisis yang pada penelitian ini mencakup analisis aliran daya, analisis stabilitas ditinjau dari keadaan steady-state maupun transient, sudut rotor, stabilitas frekwensi dan tegangan pada saat terjadi gangguan, baik sebelum dan setelah interkoneksi. Waktu pemutusan kritis (critical clearing time) dianalisis untuk mengetahui unjuk kerja sistem setelah terjadi gangguan. Hasil analisis kondisi steady-state menunjukan perbaikan profil tegangan rata-rata pada Gardu Hubung (GH) sebesar 1,163%. Hasil analisis stabilitas menunjukan bahwa waktu pemulihan sudut rotor, frekuensi dan tegangan lebih baik setelah interkoneksi dibandingkan dengan sebelum interkoneksi. Waktu pemutusan kritis setelah interkoneksi lebih lama 0,31 detik dari sebelum interkoneksi.

English Abstract

Abstract— Power system stability analysis is required to determine performance of a power system. In this paper an analysis is performed interconnection system of Ambon, Haruku, and Saparua islands in Maluk region of Indonesia. analyses in this research include load-flow analysis, steady-state and transient stability analysis, rotor angle, frequency and voltage stability during fault conditions, both before and after interconnection. Critical clearing time has been analyzed to determine system performance after a fault interruption. Results of steady-state stability analysis show a voltage profile improvement of 1.163%. results also show that after interconnection better condition of rotor angle, frequency and voltage, and faster recovery time are obtained. Critical clearing time after interconnection is 0.31 seconds longer than before interconnection.

Item Type: Thesis (Magister)
Identification Number: TES/621.319 34/JOH/a/2015/041501287
Subjects: 600 Technology (Applied sciences) > 621 Applied physics > 621.3 Electrical, magnetic, optical, communications, computer engineering; electronics, lighting
Divisions: Fakultas Teknik > Teknik Elektro
Depositing User: Sugiantoro
Date Deposited: 06 May 2015 14:21
Last Modified: 06 May 2015 14:21
URI: http://repository.ub.ac.id/id/eprint/158652
Full text not available from this repository.

Actions (login required)

View Item View Item